Warning: Trying to access array offset on value of type null in /var/www/html/youportal/platform/assets/template/default/10046/modules_pages/page_banner.php on line 44

Warning: Undefined array key "color" in /var/www/html/youportal/platform/assets/template/default/10046/modules_pages/2089_project_details.php on line 60

Warning: Undefined array key "text" in /var/www/html/youportal/platform/assets/template/default/10046/modules_pages/2089_project_details.php on line 60

Warning: Undefined array key "color" in /var/www/html/youportal/platform/assets/template/default/10046/modules_pages/2089_project_details.php on line 60

Warning: Undefined array key "text" in /var/www/html/youportal/platform/assets/template/default/10046/modules_pages/2089_project_details.php on line 60

Warning: Undefined array key "color" in /var/www/html/youportal/platform/assets/template/default/10046/modules_pages/2089_project_details.php on line 60

Warning: Undefined array key "text" in /var/www/html/youportal/platform/assets/template/default/10046/modules_pages/2089_project_details.php on line 60

Warning: Undefined array key "color" in /var/www/html/youportal/platform/assets/template/default/10046/modules_pages/2089_project_details.php on line 60

Warning: Undefined array key "text" in /var/www/html/youportal/platform/assets/template/default/10046/modules_pages/2089_project_details.php on line 60

Warning: Undefined array key "color" in /var/www/html/youportal/platform/assets/template/default/10046/modules_pages/2089_project_details.php on line 60

Warning: Undefined array key "text" in /var/www/html/youportal/platform/assets/template/default/10046/modules_pages/2089_project_details.php on line 60

Projects Manager

Community 20 Year Preventive Maintenance & Facelift

As your community approaches its two-decade milestone, it's of utmost importance to implement strategic foresight and meticulous planning. This proactive approach is instrumental in rejuvenating the community's common areas, restoring them to their original standards and qualities which might currently be deteriorating or inadequately maintained.

Duration: Aug 31, 2023 - Feb 05, 2025

Client: The Village at White Bluff Suwanee

Manager: Alexious Fiero

  • Milestone #1: Zone 5 - Front Street Treeline (18 Trees)
    • Cut trees down 50%, prime affected grass area and fill unit #645 with dirt. - Completed
    • Trim back sides. Scheduled for 02/10/2025 - Pending
  • Milestone #2: Zone 3 and 4
    • Trim and cut back the overgrown trees. -
    • Implement Bermuda sod to stabilize the soil. -
    • Retaining Wall Repair and fill dirt. -
    • Ground Preparation, Grading, and Installation of Shade Tolerant Bermuda Sod under the Crape Myrtles -
    • Add top soil and sod seeding. -
  • Milestone #3: Zone 2
    • Tree Removal and Trimming in Zone 2. Scheduled for June 2024 - Pending
    • Stump and root removal before grading. Scheduled for June 2024 - Pending
    • Ground Preparation, Grading, and Installation of Sod. Scheduled for June 2024 - Pending
  • Milestone #4: Zone 1
    • Facelift Pines, remove fallen trees, - Pending
    • Trim back side or community to match Zone 2. - Pending
  • Milestone #5: Front of Units Drain pipe repairs
    • Provide list of units needing work to HOA Manager - Completed
    • Provide ability for residents to order work on the listed items. - Pending